在所有升降機設(shè)備中,固定升降機和導(dǎo)軌升降機都是需要建造地坑的,那么建造地坑有哪些要求呢?
固定升降機和導(dǎo)軌升降機所需要的地坑要求相對較高。兩系列產(chǎn)品均屬于高空作業(yè),升降高度高并承載較大的重量。所以地坑建造好壞對于整機的穩(wěn)定安全性是有很大關(guān)系的。地坑一般由客戶一方事先建造好的。地坑的深度和升降機自身高度相符,長寬較于設(shè)備的要各多出10cm左右。用混泥土固定四個預(yù)埋鐵件。預(yù)留預(yù)埋鐵件的目的是可講設(shè)備與鐵件焊接到一起,增加整機固定的牢靠性。
Fixed hydraulic scissor lifts and hydraulic lift rail pit needed requirements are relatively high. Two series of products are high-altitude operations, the height of the high and carries a greater weight. So the quality of the construction pit for the stability of the whole security is a great relationship. Pit generally constructed in advance by the customer a good party. Pit depth and lift itself highly consistent in length and width than the equipment to various more about 10cm. Fixed with four concrete embedded iron. Reserve embedded iron aim is to speak of equipment and iron pieces welded together, increase the machine fixed robustness.
如果地坑建造不合理,固定升降機固定無法水平,造成貨物安防和升降過程中重心偏斜,設(shè)備受力不均,易對機器某側(cè)或部分連接部件、支桿有所損壞,使用壽命自然減少。最主要的是埋下很大的安全隱患。如果地坑比較合理,水平上有少許偏頗,那么可在設(shè)備安裝前由安裝人員進行找平處理。問題較多者,安裝人員應(yīng)要求重新挖地坑。其次,在固定后,安裝人員需認(rèn)真確定設(shè)備是否完全水平??稍诘孛?,多層高度進行多次檢測找平。保證使用的安全性。
If unreasonable construction pit, hydraulic lifts can not be fixed level, resulting in cargo security and lift the center of gravity during the skew, equipment uneven force, easy-to-machine connections or part of a side part,somewhat damaged strut life natural decrease . The main thing is planted a big security risk. If the pit is reasonable, there is a little biased on the level,it can be installed in front of the device for leveling handled by the installer. Many problems who require re-installation should dig pits. Next, after the fixation, the installer needs to be carefully determined whether the device is perfectly horizontal. In the ground, multi-height leveling multiple testing. Ensure the safety of use.